Finaly A. McAlister, MD, FRCPC
McAlister FA. The Potential of Critical Pathways. Ann Intern Med. 1996;125:427–428. doi: https://doi.org/10.7326/0003-4819-125-5-199609010-00036
Download citation file:
© 2019
Published: Ann Intern Med. 1996;125(5):427-428.
DOI: 10.7326/0003-4819-125-5-199609010-00036